Removing
  Note
Fit all cable ties in the original positions when installing.
  Caution
To prevent damage to the electronic components when disconnecting the battery:
Observe notes on procedure for disconnecting the battery.
  N27-0090
–  Disconnect earth wire -arrow- from battery terminal → Rep. Gr.27.
–  Release quick-release fasteners and remove engine cover panel -arrows-.
  A10-0661
–  Drain coolant → Chapter.
–  Unbolt coolant expansion tank -2--arrows-.
–  Unplug electrical wiring for coolant shortage indicator switch -F66- at bottom of coolant expansion tank and move coolant expansion tank to one side with coolant hoses -1- and -3- attached.
–  Drain coolant → Chapter.
  A10-0259
–  Disconnect vacuum hoses -1 ... 3-.
–  Unplug electrical connectors:
4 - For intake air temperature sender -G42-
5 - For throttle valve module -J338-
–  Detach air intake hose -6-.
  A15-0548
–  Unbolt retaining plate for solenoid valves -arrows- located below intake manifold.
  Note
The electrical connectors -1 and 2- and vacuum hoses remain attached.
  A15-0549
–  Unplug electrical connector -arrow- at Hall sender -G40-.
  A15-0128
–  Remove bolts for fuel rail and disconnect vacuum line from fuel pressure regulator -arrows-.
–  Pull fuel rail together with injectors off intake manifold and set it aside on a clean cloth in rear of engine compartment.
  Note
Make sure the removed injectors do not become soiled.
  A15-0181
–  Detach coolant hoses from top coolant pipe.
–  Unbolt top coolant pipe from intake manifold and from coolant flange on rear of cylinder head -arrows-.
  A15-0112
–  Remove support for intake manifold -arrows-.
–  Pull out oil dipstick.
–  Unbolt intake manifold from cylinder head and remove.
  Note
Block off intake ports in cylinder head with clean rags.
Installing
Installation is carried out in the reverse order; note the following:
  Note
t  Renew gaskets and O-rings.
t  Hose connections and air pipes and hoses must be free of oil and grease before assembly.
t  Secure all hose connections with the correct type of hose clips (same as original equipment) → Electronic parts catalogue.
–  Install coolant hoses and air hoses with screw-type clips → Fig..
–  Observe notes on procedure for connecting the battery → Rep. Gr.27.
–  Fill up with coolant → Anchor.
Tightening torques → Chapter
  A15-0550