Installation is carried out in the reverse order; note the following: |
Note t
| Renew gaskets, seals, O-rings and self-locking nuts. |
t
| Hose connections and hoses for charge air system must be free of oil and grease before assembly. |
t
| When installing turbocharger, ensure that O-ring -arrow- for oil return is not damaged. |
t
| Fill turbocharger with engine oil at connection for oil supply pipe. |
t
| After installing turbocharger, allow engine to idle for approx. 1 minute and do not rev up immediately to ensure turbocharger is supplied with oil. |
–
| Install front exhaust pipe with catalytic converter: vehicles with front-wheel drive → Chapter, vehicles with four-wheel drive → Chapter. |
|
|
|