Audi Workshop Service and Repair Manuals
HOME
FEATURES
MENU
INDEX
ABOUT US
Adaption procedure >
< Adaption procedure in adaption channels "03”, "05” and "06” (and "87”)
A4 Mk2
Heating, ventilation, air conditioning system
Auxiliary heater / Self diagnosis, V.A.G Inspection Service
Adaption of auxiliary heater / aption_procedure_in_adaption_channels_quot;03_quot;05_and_quot;06_(and_quot;87)/">Adaption procedure in adaption channels "03”, "05” and "06” (and "87”)
Requirements
Requirements
Requirements
l
Battery -A- fully charged
l
Auxiliary heater fully installed and connected to vehicle electrical system
Heating, ventilation, air conditioning system
Auxiliary heater / Self diagnosis, V.A.G Inspection Service
Adaption of auxiliary heater / aption_procedure_in_adaption_channels_quot;03_quot;05_and_quot;06_(and_quot;87)/">Adaption procedure in adaption channels "03”, "05” and "06” (and "87”)
Requirements
Adaption procedure >
< Adaption procedure in adaption channels "03”, "05” and "06” (and "87”)