audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Wastegate Actuator|Testing and Inspection|Page 4617 > < Wastegate Actuator|Testing and Inspection|Page 4615
Page 4
background image

-

Read and make a not of the value on Dial Indicator (VAS 6341/1).

-

Operate Hand Vacuum Pump (VAS 6213) until Turbocharger Tester (V.A.G 1397A) displays 650 mbar to 700 mbar.

-

Reduce pressure to 460 +/- 5 mbar using the Pressure Control Valve (VAS 6342).

‹› If 460 +/- 5 mbar is not reached, then the measuring must be started again from the beginning.

-

Read and make a not of the value on Dial Indicator (VAS 6341/1).

-

Add value 1 and 2 and divide by 2.

-

The result (mean value) must be 5 +/- 0.5 mm.

-

If the value is greater, then lower the pressure to 0 bar, loosen the nut - 1 - and turn the nut - 2 - a half a turn and then tighten the nut - 1 -
hand-tight.

-

Set the Dial Gauge (VAS 6341/1) to 1 mm pretension.

-

Turn the Dial Gauge (VAS 6341/1) display to 0 and repeat the measurement.

-

If the average value is 5 +/- 0.5 mm, then tighten the lock nut and repeat the measurement.

-

If the average value is 5 +/- 0.5 mm, then secure the nuts with sealing wax.

-

Secure the new securing plate - 1 - over vacuum diaphragm linkage.

Wastegate Actuator|Testing and Inspection|Page 4617 > < Wastegate Actuator|Testing and Inspection|Page 4615