bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

1 RA Replacing Wiring Harness Section For Engine (S54)|Page 776 > < 2 RA Replacing Safety Battery Terminal (SBK)|Page 773
Page 1
background image

12 51 001

Replacing wiring harness section for engine
(S54)

Note:

Switch off ignition.

Follow instructions for disconnecting and connecting battery.

Disconnect and cover battery negative lead.

Preparatory tasks:

· 

Remove intake air manifold.

· 

Remove fan cowl.

· 

Remove ignition coil cover.

Work step

Note:

Unlock plug on idle-speed control valve and disconnect.

Unlock plug on throttle actuator and disconnect

Unlock plug on throttle potentiometer and disconnect

Unlock plug on solenoid valve for VANOS and disconnect

Unlock connector strip of fuel injectors and disconnect

Follow removal instructions.

Disconnect plug of inlet camshaft sensor from connector strip.

Unlock plug on oil pressure switch and disconnect

Unlock plug on coolant temperature sensor and disconnect

Unlock plug on knock sensors and disconnect

Unlock pulse generator plug on exhaust camshaft and disconnect

Unlock plug on alternator and disconnect
Detach battery positive lead at alternator.

Remove oil lines.
 Note tightening torque

Unlock plug on oil level switch and disconnect

Do not remove oil level switch.

Detach battery positive lead and control lead from starter motor.

Note tightening torque.

Unlock pulse generator plug for crankshaft on distributor housing and disconnect

Unlock plug connections in electronics box and disconnect:

RA  Replacing wiring harness section for engine (S54)

BMW AG - TIS

16.02.2013  16:14

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

1 RA Replacing Wiring Harness Section For Engine (S54)|Page 776 > < 2 RA Replacing Safety Battery Terminal (SBK)|Page 773