bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

2 RA Removing And Installing, Sealing_replacing Right VANOS Adjustment Unit (S62)|Page 986 > < 2 RA Removing And Installing, Sealing_replacing Right VANOS Adjustment Unit (S62)|Page 984
Page 6
background image

Replace O-rings (1 and 2) on VANOS adjustment unit.

Note:

New O-rings are already fitted on replacement or new parts.

Coat O-rings (1) with oil as anti-friction agent.

Caution!

O-rings (2) fall out very easily, secure with grease if
necessary.

Place VANOS adjustment unit on toothed shafts (1).

Caution!

CCW thread!

When tightening down toothed shafts, support VANOS
adjustment unit with your hand.

Grip twin surface (1) and screw together at hexagon
head (2) alternately between exhaust and inlet sides in 1/2
turn steps.

Tighten down toothed shaft screw connection on inlet and exhaust
sides.

Tightening torque 10 Nm.

Disconnect compressed air from special tool  11 7 130 .

RA  Removing and installing, sealing/replacing right VANOS adjustment unit (S62)

BMW AG - TIS

21.02.2013  15:27

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 6 -

2 RA Removing And Installing, Sealing_replacing Right VANOS Adjustment Unit (S62)|Page 986 > < 2 RA Removing And Installing, Sealing_replacing Right VANOS Adjustment Unit (S62)|Page 984