bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

5 RA Removing And Installing_replacing Left VANOS Gear (S62)|Page 1081 > < 5 RA Removing And Installing_replacing Left VANOS Gear (S62)|Page 1079
Page 17
background image

Cylinder bank 5 to 8 (inlet side):

Install spline hub (1) with plate spring and supporting ring.

Note:

Align spline hub (1) so that oil pump is positioned as shown in
picture.

Cylinder bank 5 to 8 (inlet side):

Fit spacer ring (2).

Insert all bolts and initially tighten without play.

Then slacken bolts again until spline hub (1) can be moved with
fingers.

Install left timing case cover.

Caution!

Risk of mixing up parts.

The VANOS adjustment units of cylinder banks 1 to 4 and
5 to 8 are different.

1)

Cylinder bank 1 to 4

2)

Cylinder bank 5 to 8

Note:

Install VANOS adjustment unit so that solenoid valve cables are at
bottom.

RA  Removing and installing/replacing left VANOS gear (S62)

BMW AG - TIS

21.02.2013  15:28

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 17 -

5 RA Removing And Installing_replacing Left VANOS Gear (S62)|Page 1081 > < 5 RA Removing And Installing_replacing Left VANOS Gear (S62)|Page 1079