5 Series E39 M5 (S62) SAL
Crank engine at central bolt in direction of rotation until 1st
cylinder is at TDC firing position.
Secure vibration damper in position with special tool 11 2 300 .
Cylinder bank 1 to 4:
Slacken six accessible bolts two turns.
Cylinder bank 5 to 8:
Slacken remaining six bolts two turns.
Cylinder bank 1 to 4:
Note:
The camshafts have an opening. The 1st bearing caps have a
locating bore.
Align camshaft opening to locating bore in bearing cap and secure
in position with special tool 11 7 120 .
RA Removing and installing/replacing toothed shafts of VANOS gear on left and right
BMW AG - TIS
21.02.2013 19:38
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 7 -