bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

1 RA Replacing All Conrod Bearings (N62_N62TU)|Page 359 > < 2 RA Removing And Installing_replacing Vibration Damper Hub (N62_N62TU)|Page 356
Page 1
background image

11 24 571

Replacing all conrod bearings (N62/N62TU)

Special tools required:

00 2 590

00 9 120

11 2 110

(piston removed)

 

Important!

Note grinding stages on crankshaft

The letter (1) denotes the crankshaft construction stage.

The numbers (2) denote the bearing shell classification for the
relevant bearing position from 1 to 5 (main bearing cap).

Install new conrod bearing shells.

Insert one red and one blue bearing shell for each conrod.

Install piston.

RA  Replacing all conrod bearings (N62/N62TU)

BMW AG - TIS

04.02.2013  04:22

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

1 RA Replacing All Conrod Bearings (N62_N62TU)|Page 359 > < 2 RA Removing And Installing_replacing Vibration Damper Hub (N62_N62TU)|Page 356