bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

10 Radiator, Expansion Tank, Pipes > < 5 RA Venting Cooling System And Checking For Leaks (N52)
Page 2
background image

Only when venting!

Note:

Fill coolant expansion tank up to lower edge of filler neck with
recommended coolant. Close cap on expansion tank.

Do not open the coolant expansion tank cap during the venting
procedure.

1. 

Connect battery charger.

2. 

Switch on ignition.

3. 

Set heater to maximum temperature, activate "Automatic"

button, then reduce fan to lowest setting.

4. 

Press accelerator pedal for 10 seconds to floor.  Engine

must  not be started.

5. 

The venting procedure is started when the accelerator pedal

is pressed and takes approx. 12 minutes.

6. 

Then top up fill level in coolant expansion tank with 250 ml

above max (see illustration).

7. 

Check cooling system for leaks.

8. 

If the venting procedure has to be carried out several times,

allow DME to drop completely (ignition key removed for
approx. 3 minutes), then repeat from Point 3.

Only when venting!

Perform filling operation slowly.

Fill coolant expansion tank with 250 ml above max.

RA  Venting cooling system and checking for leaks (N52)

BMW AG - TIS

07.02.2013  00:35

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 2 -

10 Radiator, Expansion Tank, Pipes > < 5 RA Venting Cooling System And Checking For Leaks (N52)