X Series E70 X5 3.0Sd (M57T2) OFFRD
Installation:
Visually inspect shaped sealing ring (1) for correct seating and
damage.
Coat all mounting fittings with anti-friction agent (2). Refer to
Technical Data.
Lock locking clip (4).
Attach pressure pipe (3) in direction of arrow.
Installation:
VDA couplings are correctly fitted when they snap into place with
an audible click.
Check function of DDE.
Check pressure pipe for leaks.
RA Removing and installing/replacing left pressure pipe (charge air hose) (M57TU)
BMW AG - TIS
05.02.2013 01:59
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -