DeVille DTS V8-4.6L VIN 9 (2002)
Installation Procedure
1. Install the rack and pinion boot (3) to the rack and pinion gear assembly.
2. Install a new rack and pinion boot clamp.
3. Using J 22610, crimp the rack and pinion boot clamp.
4. Install the tie rod end clamp (2) from the pinion boot (1).
5. Install the hex jam nut (2) to the inner tie rod assembly.
6. Install the outer tie rod.
7. Install the tire and wheel.
8. Lower the Vehicle. Refer to Vehicle Lifting.
9. Adjust front toe.