chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Wheel Bearing > < Wheels and Tires|Removal|Page 8608
Page 4
background image

14. Let the wheel soak for 1 to 3 minutes.
15. Rinse the wheel with water. Blow the wheel dry with compressed air.
16. Soak the wheel with Amchem number 1001 or the equivalent.
17. Let the wheel soak for 1 to 3 minutes.
18. Rinse the wheel with water. Blow the wheel dry with compressed air.
19. Mask off the tire.
20. Finish the wheel with Ditzler Delclear Acrylic Urethane and Ditzler Ultra-Urethane Additive or the equivalent using the following three coats.

Refer to the labels for specific instructions.
^

First coat-light mist coat, let flash.

^

Second coat-light, let flash.

^

Third coat-heavy double wet coat.

21. Let the wheel dry for 24 hours (or flash for 30 minutes, force dry at 60° C (140° F) for 30 minutes, and allow to cool for 30 minutes before

mounting.

INSTALLATION PROCEDURE

1. Balance the wheel and the tire assembly.
2. Replace the original balance weights with nylon coated weights in order to avoid discoloration of the wheel.
3. Install the tire and the wheel assembly. Refer to WHEEL INSTALLATION.

Wheel Bearing > < Wheels and Tires|Removal|Page 8608