EL Camino V8-350 5.7L DSL (1982)
a. Position injector lines in proper position and connect injector lines to injection pump. Torque line nuts to 25 ft. lbs.
b. Install injection line clips.
6. Connect fuel return line to injection pump.
7. Install fuel filter and bracket, then install fuel line. Return to Fig. 65, for torque specifications.
8. Install throttle and T.V. detent cables. Adjust T.V. cable.
9. Install bellcrank, then install throttle rod and throttle return spring. If equipped with A/C, install rear compressor brace.
10. Remove screened covers, then install air crossover.
Fig. 23 Crankcase Ventilation System
11. Install crankcase ventilation filters and pipes to valve covers and air crossover, Fig. 23.
12. Install air cleaner assembly. Connect battery ground cables.
13. Start engine and allow to idle for several minutes. Turn ignition "Off," for approximately two minutes, then restart to allow air to bleed off within
pump.