Express 2500 V8-6.6L DSL Turbo (2010)
6. Install the fuel pipe bracket bolt and tighten to 25 Nm (18 lb ft).
7. Install the EGR coolant pipe. Refer to Exhaust Gas Recirculation Coolant Hoses/Pipes Replacement (LLY/LBZ) (See: Powertrain
Management/Emission Control Systems/Exhaust Gas Recirculation/EGR Cooler/Service and Repair/Exhaust Gas Recirculation Coolant
Hoses/Pipes Replacement) Exhaust Gas Recirculation Coolant Hoses/Pipes Replacement (LGH) (See: Powertrain Management/Emission Control
Systems/Exhaust Gas Recirculation/EGR Cooler/Service and Repair/Exhaust Gas Recirculation Coolant Hoses/Pipes Replacement) Exhaust Gas
Recirculation Coolant Hoses/Pipes Replacement (LMM) (See: Powertrain Management/Emission Control Systems/Exhaust Gas
Recirculation/EGR Cooler/Service and Repair/Exhaust Gas Recirculation Coolant Hoses/Pipes Replacement).
8. Connect the coolant temperature sensor electrical connector.
9. Install the oil fill tube bolts and the oil fill tube and tighten to 25 Nm (18 lb ft).