Lumina V6-3.1L VIN J (2000)
INSTALLATION PROCEDURE
IMPORTANT: The new O-ring seals must be lubricated with mineral base 525 viscosity refrigerant oil.
1. Install the new O-ring seals onto the evaporator liquid line.
2. Install the liquid line into place.
NOTE: Refer to Fastener Notice in Service Precautions.
3. Install the liquid line at the block fitting.
Tighten
Tighten the liquid line block fitting bolt to 16 N.m (12 lb ft).
4. Install the liquid line nut (1) at the orifice.
Tighten
Tighten the liquid line nut to 27 N.m (20 lb ft).