chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Generator Control Module Ground Strap Replacement|Page 4609 > < Generator Control Module Ground Strap Replacement|Page 4607
Page 4
background image

15. Install the 3 phase cable retainer (1) to the bracket.
16. Install the 3 phase cable retainer nut (2).

Tighten the nut to 9 Nm (80 lb in).

17. Install the PIM 3 phase cables (3, 5) into the PIM distribution box with new seals (6).
18. Install the PIM 3 phase cable mounting fasteners (2, 4).

Tighten the mounting fastener to 9 Nm (80 lb in).

Caution:  Always remove and install the High Voltage terminal fasteners with a magnet tipped socket. Never touch the exposed electronic circuit
board surface or components. Dropped fasteners or physical contact may result in electronic circuit board damage.

19. Install the PIM 3 phase cable terminal fasteners (1).

Tighten the terminal fastener to 9 Nm (80 lb in).

Generator Control Module Ground Strap Replacement|Page 4609 > < Generator Control Module Ground Strap Replacement|Page 4607