SSR V8-6.0L VIN H (2006)
3. Install all the block connectors including (1, 2) to the electrical center base. Ensure the connectors are fully seated.
4. Install the electrical center to the base ensuring the 4 retaining tabs are fully seated.
5. Install the nut (4) retaining the positive battery terminal to the electrical center.
Tighten the nut to 10 N.m (88 lb in).
6. Tighten bolts (1, 2, 3).
Tighten the bolts to 3.5 N.m (31 lb in).
7. Install the connector (1) to the electrical center.