PT Cruiser L4-2.4L (2008)
Shift Cable: Service and Repair
Installation
INSTALLATION
CAUTION: Gearshift cable bushings must not be lubricated or the bushings will swell and split.
1. Raise vehicle on hoist.
2. Install cable assembly through floor pan opening and secure to floor pan with grommet plate (2) and one screw. Make sure the three grommet plate
studs protrude through cable assembly (1) and floor pan and tighten screw to 7 Nm (60 in. lbs.).
3. Route transaxle end of cable assembly into engine compartment and over transaxle assembly.
4. Install converter heat shield (1).