PT Cruiser L4-2.4L Turbo (2009)
14. Replace stop lamp switch.
15. Install lower instrument panel bezel (2).
16. Install Totally Integrated Power Module (TIPM) bracket into position.
17. Connect battery negative cable.
18. Install air cleaner assembly (1).
19. Verify that brake master cylinder reservoir is full. Top off with DOT 3 brake fluid if necessary.
20. Actuate clutch pedal a minimum of fifty times to allow any air ingested into the system to vent to the master cylinder reservoir. If residual air
becomes trapped in the system, it is necessary to bleed the clutch hydraulic system. See: Service and Repair
21. Verify proper clutch release system operation.