Testing and Inspection for Leganza CDX Neutral Safety Switch (1999)
Tighten the shift control cable linkage retaining nut to 15 Nm (11 ft. lbs.).
Tighten the fluid filler tube bracket retaining nut to 15 Nm (11 ft. lbs.).
5. Connect the PNP switch electrical connector to the wiring harness.
6. Install the battery and battery tray.