dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

A/C Discharge Line - Removal|Page 5856 > < A/C Discharge Line - Removal|Page 5854
Page 1
background image

Hose/Line HVAC: Service and Repair
A/C Discharge Line - Installation

INSTALLATION

CAUTION: Be certain to adjust the refrigerant oil level when servicing the A/C refrigerant system See: Service and Repair/Refrigerant Oil Level 

. Failure to properly adjust the refrigerant oil level will prevent the A/C system from operating as designed and can cause serious
A/C compressor damage.

CAUTION: If replacing the A/C discharge line, be sure to use the discharge line designed for the A/C compressor in the vehicle. If replacing

the 6SEU16 compressor, be sure to use the latest level of A/C discharge line during replacement. Failure to use the correct A/C
discharge line could result in possible discharge line and/or compressor damage.

NOTE: When replacing multiple A/C system components, refer to the Refrigerant Oil Capacities chart to determine how much oil should be

added to the refrigerant systemSee: Service and Repair/Refrigerant Oil Level .

NOTE: Replacement of the refrigerant line O-ring seals and gaskets is required anytime a refrigerant line is disconnected. Failure to replace

the rubber O-ring seals and metal gaskets could result in a refrigerant system leak.

1. If removed, install the A/C pressure transducer (2) onto the A/C discharge line (3). Tighten the A/C pressure transducer securely.
2. Position the A/C discharge line into the engine compartment.
3. Remove the tape or plugs from the discharge line fitting and the condenser port.
4. Lubricate a new rubber O-ring seal with clean refrigerant oil and install it and a new gasket onto the discharge line fitting. Use only the specified

O-ring as it is made of a special material for the R-134a system. Use only refrigerant oil of the type recommended for the A/C compressor in the
vehicle.

5. Reach down through the opening between the radiator and the front fascia and connect the A/C discharge line to the A/C condenser (4).
6. Install the nut (5) that secures the A/C discharge line to the A/C condenser. Tighten the nut to 5 Nm (44 in. lbs.). 

7. Connect the wire harness connector (1) to the A/C pressure transducer.
8. Install the upper radiator closure panel See: Body and Frame/Spoilers, Flaps, and Air Dams/Air Dam/Service and Repair/Upper Closure Panel -

Installation.

A/C Discharge Line - Removal|Page 5856 > < A/C Discharge Line - Removal|Page 5854