Charger V6-3.5L (2009)
1. Clean and inspect the gasket sealing surfaces.
2. Position the new gasket.
3. Install the upper intake manifold insulator foam.
4. Install the upper intake manifold. Tighten the bolts to 12 Nm (105 in. lbs.) starting in the center working outward in a cross sequence pattern.
5. Install the intake manifold support brackets. Tighten fasteners (2) to 12 Nm (105 in. lbs.).
6. Connect the electrical connectors to the manifold tuning valve (1) and short runner valve (2).