Charger V6-3.5L (2009)
4. Lubricate and install the 1-2 / 4-5 Overlap Regulating Valve, Sleeve, and Piston assembly (1), Shift Pressure Regulating Valve assembly (2),
Control Valve Pressure Regulator Valve assembly (3) and Shift Solenoid Pressure Regulating Valve assembly (4) into the valve body.
5. Install the side cover and the screws holding the side cover (5) to the valve body and valve housing. Tighten the screws to 4 Nm (35 in.lbs.).