Durango 4WD V8-4.7L VIN P Flex Fuel (2007)
Trunk / Liftgate Motor: Service and Repair
Power Liftgate Drive Unit
Removal
REMOVAL
1. Open the liftgate.
2. Disconnect and isolate the battery negative cable.
3. Remove the link rod assembly (6) from the liftgate attachment point (7).
4. Remove the left rear D-pillar (1) trim panel from the vehicle.
5. Disconnect the wire harness connector (2) from the power liftgate drive unit assembly (3).
6. Remove the drive unit assembly retaining bolts (4).
7. Unhook the drive unit assembly (3) from the D-pillar (1) and remove the unit from the vehicle.
Installation
INSTALLATION
1. Install the power liftgate drive unit assembly (3) onto the D-pillar (1).
2. Install the drive unit retaining bolts (4). Torque the bolts to 39 Nm (28.5 ft. lbs.).