RAM 1500 Truck 2WD V6-3.7L VIN K (2003)
6. Install the A/C compressor (Refer to HEATING & AIR CONDITIONING / PLUMBING / A/C COMPRESSOR INSTALLATION).
7. Install the generator (Refer to ELECTRICAL / CHARGING / GENERATOR INSTALLATION).
8. Install accessory drive belt tensioner assembly (Refer to COOLING / ACCESSORY DRIVE / BELT TENSIONERS INSTALLATION).
9. Install radiator upper and lower hoses.
10. Install both heater hoses.
11. Install electric fan shroud and viscous fan drive assembly (Refer to COOLING / ENGINE / FAN DRIVE VISCOUS CLUTCH
INSTALLATION).
12. Fill cooling system (Refer to COOLING / STANDARD PROCEDURE).
13. Connect the battery negative cable.