dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Procedures|Page 6726 > < Procedures|Page 6724
Page 3
background image

EGR COOLER - 6.7L DIESEL - P/U

12. Install EGR Control Assembly, if equipped. Tighten mounting bolts to 24 Nm (18 ft. lbs.).
13. Install EGR Control Assembly electrical connector, (if equipped).
14. Fill coolant system.
15. Install engine cover.
16. Connect negative battery cable(s).
17. Start engine and check for coolant or exhaust leaks.

Removal-Pick Up Models

REMOVAL-PICK UP MODELS

The EGR Cooler Bypass Valve Assembly (1) is mounted between the EGR crossover tube and the EGR cooler. Two mechanical cables (3) join the units
together. An electrical drive servo (4) moves the cables (3) to operate a butterfly plate (2) within a cast manifold.

Parts 1, 2, 3 and 4 are serviced as one entire assembly. Do not attempt to disassemble unit.

1. Disconnect and isolate both negative battery cables at both batteries.

Procedures|Page 6726 > < Procedures|Page 6724