SRT-4 L4-2.4L Turbo VIN S (2004)
10. Tighten upper pump mounting bolt (Fig. 9) to 28 Nm (250 inch lbs.) torque.
11. Install accessory drive belt.
12. Install accessory drive belt splash shield.
13. Install right front tire and wheel assembly. Tighten wheel mounting nuts to 135 Nm (100 ft. lbs.) torque.
14. Lower vehicle.
15. Perform POWER STEERING PUMP INITIAL OPERATION procedure to properly fill and bleed power steering system.
16. Check for leaks.