eagle Workshop Repair Guides

Eagle Workshop Service and Repair Manuals

Armature Balance Test|Page 1618 > < Armature Balance Test
Page 1
background image

Starter Armature: Testing and Inspection
Armature Ground Test

1.

Place armature in growler and turn power switch to TEST position.

2.

Place one lead of test lamp on armature core and other lead to each commutator bar.

3.

If test lamp lights at any time, replace armature.

Armature Balance Test|Page 1618 > < Armature Balance Test