E 450 V10-6.8L (2008)
10. Install the transmission fluid indicator and tube support bracket nut.
^
Tighten to 10 Nm (89 lb-in).
11. Connect the RH 5 fuel injector electrical connectors.
12. Connect the A/C compressor and the CKP sensor connectors and install a tie-strap.
13. Position the splash shield and install the pushpin retainers.