ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 3142 > < Initial Inspection and Diagnostic Overview|Page 3140
Page 25
background image

Refer to Wiring Diagram Set 14, Module Communications Network for schematic and connector information.  See: Diagrams/Electrical
Diagrams/Diagrams By Number

Normal Operation

The Smart Junction Box (SJB) communicates with the scan tool through the Medium Speed Controller Area Network (MS-CAN).

This pinpoint test is intended to diagnose the following:

-

Fuse

-

Wiring, terminals or connectors

-

SJB

 

PINPOINT TEST I: THE SJB DOES NOT RESPOND TO THE SCAN TOOL

NOTICE:  Use the correct probe adapter(s) when making measurements. Failure to use the correct probe adapter(s) may damage the
connector.

NOTE:  Failure to disconnect the battery when instructed will result in false resistance readings. Refer to Battery.

-------------------------------------------------
I1 CHECK THE SJB VOLTAGE SUPPLY CIRCUIT FOR AN OPEN

 

-

Ignition ON.

-

NOTE: Measurements are taken with the fuses installed.

-

Measure the voltage between the SJB fuse 5 (10A) and ground.

-

Is the voltage greater than 10 volts?

Yes

GO to I2.

No

VERIFY the SJB fuse 5 (10A) is OK. If OK, GO to I4. If not OK, REFER to the Wiring Diagrams to identify the possible causes of the circuit short.  
See: Diagrams/Electrical Diagrams/Diagrams By Number

-------------------------------------------------
I2 CHECK THE SJB GROUND CIRCUITS FOR AN OPEN

 

-

Ignition OFF.

-

Disconnect: Negative Battery Cable.

-

Disconnect: SJB C2280d.

-

Measure the resistance between the SJB C2280d-8, circuit GD139 (BK/YE), harness side and ground; and between the SJB C2280d-12, circuit
GD139 (BK/YE), harness side and ground.

Initial Inspection and Diagnostic Overview|Page 3142 > < Initial Inspection and Diagnostic Overview|Page 3140