F 150 4WD Pickup V8-5.4L CNG VIN M (2001)
5. Tighten the main control valve body bolts in the sequence shown.
6. Inspect the lead frame for damage.
-
Using the special tool, check all lead frame solenoid connections.
-
If the special tool passes through any lead frame connector pins, install a new lead frame.