F 250 4WD LD Pickup V8-5.4L SOHC VIN L (1997)
3. Install the EPC check ball spring.
NOTE: Apply petroleum jelly to the EPC check ball spring prior to installing it into the case.
4. Position the valve body separator plate and the gaskets to the case carefully to retain the check balls.
5. Install the separator plate reinforcement plate.
(1) Position the separator plate reinforcement plate.
(2) Install the bolts.
NOTE: The word "UP" stamped on the separator plate reinforcement, must be visible when installed.
6. Install the solenoid screen assembly by pushing it in and rotating it to lock.