F 350 2WD Super Duty V8-6.4L DSL Turbo (2009)
19. Install the new gasket and the 2 new bolts for the EGR cooler.
-
Tighten to 31 Nm (23 lb-ft).
20. Tighten the 2 EGR-OC pipe bolts at the RH turbocharger inlet pipe.
-
Tighten to 31 Nm (23 lb-ft).
21. Tighten the 2 bolts for the EGR-OC pipe bracket at the turbocharger.
-
Tighten to 31 Nm (23 lb-ft).
22. Install a new gasket and loosely install the new clamp for the exhaust downpipe.
-
Align the new exhaust downpipe-to-turbocharger clamp so that the exhaust downpipe clip and the opening in the exhaust
downpipe-to-turbocharger clamp are aligned and tighten to maintain position.
-
Align the downpipe so that the area just above the flat in the pipe is approximately 20 mm (0.787 in) from the frame.
23. NOTICE: Failure to install and correctly tighten the Exhaust Gas Recirculation (EGR)-OC pipe support bolt will result in damage to the
horizontal EGR cooler and possible engine damage.
Tighten the bolt for the EGR-OC pipe bracket.
-
Tighten to 31 Nm (23 lb-ft).