F 350 2WD Super Duty V8-6.4L DSL Turbo (2009)
18. Connect the EGRT sensor electrical connector.
19. NOTE: Do not install the exhaust downpipe until the RH turbocharger inlet pipe and the EGR-OC pipe are installed and all fasteners are
tightened.
Position the exhaust downpipe into the vehicle and loosely install the 2 exhaust downpipe-to-OC bolts.
20. Install a new exhaust downpipe-to-turbocharger gasket.
21. Position the exhaust downpipe to the turbocharger and install and pre-tighten a new exhaust downpipe-to-turbocharger clamp.
-
Make sure the exhaust downpipe clip is over the lip on the turbocharger.
-
Align the new exhaust downpipe-to-turbocharger clamp so that the exhaust downpipe clip and the opening in the exhaust
downpipe-to-turbocharger clamp are aligned and tightened to maintain position.
-
Align the downpipe so that the area just above the flat in the pipe is approximately 20 mm (0.787 in) from the frame.
-
Pre-tighten to 10 Nm (89 lb-in) to stiffen the joint.
22. Tighten the 2 exhaust downpipe-to-OC bolts.
-
Tighten to 40 Nm (30 lb-ft).
23. Tighten the exhaust downpipe-to-turbocharger clamp.
-
Tighten to 15 Nm (133 lb-in).
24. Install the vehicle body.
25. Bleed the high-pressure fuel system.