General Procedures Special Tool(s) | Vehicle Communication Module (VCM) and Integrated Diagnostic System (IDS) software with appropriate hardware, or equivalent scan tool | Programmable Module Installation (PMI) Using the Integrated Diagnostic System (IDS) When the Original Module is Available NOTE:Following module installation, some modules require a separate learning procedure be carried out. For adaptive learning and calibration instructions, refer to the specific module removal and installation procedures. | -
Connect the IDS and identify the vehicle as normal. | | -
From the Toolbox icon, select Module Programming and press the check mark. | | -
Select Programmable Module Installation. | | -
Select the module that is being replaced. | | -
Follow the on-screen instructions, turn the ignition key to the OFF position, and press the check mark. | | -
Install the new module and press the check mark. | | -
Follow the on-screen instructions, turn the ignition key to the ON position, and press the check mark. | | -
The IDS downloads the data into the new module and displays Module Configuration Complete. | | -
Test module for correct operation. | Programmable Module Installation (PMI) Using the Integrated Diagnostic System (IDS) When the Original Module is NOT Available NOTE:Following module installation, some modules require a separate learning procedure be carried out. For adaptive learning and calibration instructions, refer to the specific module removal and Installation procedures. | -
Connect the IDS and identify the vehicle as normal. | | -
From the Toolbox icon, select Module Programming and press the check mark. | | -
Select Programmable Module Installation. | | -
Select the module that was replaced. | | -
Follow the on-screen instructions, turn the ignition key to the OFF position, and press the check mark. | | -
Follow the on-screen instructions, turn the ignition key to the ON position, and press the check mark. | | -
If the data is not available, the IDS displays a screen stating to contact the As-Built Data Center. Retrieve the data from the technician service publication website at this time and press the check mark. | | -
Enter the module data and press the check mark. | | -
The IDS downloads the data into the new module and displays Module Configuration Complete. | | -
Test module for correct operation. | |