Description and Operation Installation is made of urethane, PVC and recycled felt. The insulation is installed: - under the roof.
- above and below the instrument panel.
- at the cowl side panels.
- over the front and rear floor pans.
- inside the A, B, D pillar sections.
- behind the rear quarter trim panel.
It has heat-bondable mastic deadeners for improved NVH characteristics. |