Removal and Installation Removal NOTE: Measurement and alignment angle system | -
-
A-Pillar Outer Panel / A-Pillar Reinforcement Refer to: A-Pillar Assembly (501-29 Side Panel Sheet Metal Repairs, Removal and Installation). -
B-Pillar / B-Pillar Reinforcement Refer to: B-Pillar and Reinforcement (501-29 Side Panel Sheet Metal Repairs, Removal and Installation). | | -
NOTE: Depending upon the cut locations A-Pillar or B-Pillar must not be removed! | Installation - Before resistance spot welding of body panels with a total panel thickness of 3 mm and greater, the welding equipment instructions contained in sub-section 501-25 must be followed.
- Sealer or adhesive must not be applied in welding zones. Areas which were bonded or sealed needs to be thoroughly sealed afterwards.
| -
-
NOTE:The final welded joint is made with the rocker panel installed. Resistance spot weld. | | -
-
NOTE:The final welded joint is made with the rocker panel installed. Resistance spot weld. | | |