ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Shift Solenoid, A/T > < A/T - 4EAT Harsh 1-2 Upshift|Page 4391
Page 4
background image

13.

Replace 0-rings (99541-00407) on oil pipe (2 required) and install oil pipe, oil baffle, 2-3 shift solenoid and 3-4 shift solenoid and torque bolts to
6.5-7.8 N.m (58-69 lb-in).

14.

Turn main control over on bench so that the rear control is facing downward.

15.

Remove line pressure and TCC solenoid and replace with revised Solenoids (F32Z-7G136-AA - 2 required) (Figure 5).

16.

Install main control into transaxle and torque bolts to 6.5-7.8 N.m (58-69 lb-in).

NOTE

THE SOLENOID CONNECTORS ARE COLOR CODED FOR PROPER INSTALLATION.

17.

Install the six (6) connectors to the solenoids and the Transmission Fluid Temperature (TFT) sensor.

18.

Replace the Main Control Cover Gasket (E92Z-7F396-A) and install main control cover.

19.

Add 1.9L (2 quarts) of Motorcraft MERCON(R) Multi-Purpose Automatic Transmission Fluid (ATF) (XT-2-QDX). Bring transaxle to normal
operating temperature and adjust fluid level.

20.

Recheck control pressure at idle and stall speed. Road test vehicle to verify repair.

Shift Solenoid, A/T > < A/T - 4EAT Harsh 1-2 Upshift|Page 4391