gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Technician Safety Information|Page 5271 > < Technician Safety Information|Page 5269
Page 3
background image

1. Insert the battery positive cable (2) into the battery cables harness conduit (6).
2. Close the battery cables harness retainer (5) at the engine wiring harness bracket (1).

NOTE:  Refer to Fastener Notice in Service Precautions.

3. Connect the battery positive cable (2) to the starter and install the starter terminal nut (1).

Tighten
Tighten the battery positive cable to starter terminal nut to 9 N.0m (80 lb in).

4. Install the left wheelhouse liner.
5. Lower the vehicle.

Technician Safety Information|Page 5271 > < Technician Safety Information|Page 5269