gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Deployment Procedures|Page 13805 > < Deployment Procedures|Page 13803
Page 14
background image

39. Twist together, bend, and tape the remaining connector wire lead to the remaining deployment wire.
40. Connect the deployment harness to the inflatable restraint IP module yellow 2-way connector.

41. Route the deployment harness out of the passenger side of the vehicle.

42. Disconnect the passenger side air bag yellow 2-way connector (1) from the vehicle wiring harness (2) located under the passenger seat.

43. Cut the two side impact air bag wires leading to the yellow 2-way harness connector, leaving at least 16 cm (6 in) of wire at the connector.
44. Strip 13 mm (0.5 in) of insulation from each of the side impact air bag connector wire leads.

Deployment Procedures|Page 13805 > < Deployment Procedures|Page 13803