S15/T15 Sonoma P/U 4WD V6-4.3L VIN X (1998)
9. Tap gently on the brass drift in order to tilt the cage (1).
10. Install the first ball (2) when the cage tilts.
11. Repeat previous step to reinstall all of the balls.
12. Pack the Constant Velocity (CV) joint boot and the CV joint assembly with the grease supplied in the kit. The amount of grease supplied in this kit
has been pre-measured for this application.
13. Place the new small swage clamp (2) onto the CV joint boot (1).
14. Place the large retaining clamp on the boot (1).
15. Position the small end of the CV joint boot (1) into the joint boot groove (3) on the halfshaft bar.
16. Position the outboard end of the halfshaft assembly (1) in J 41048.
17. Align the swage clamp (2) within J 41048.