Veracruz FWD V6-3.8L (2009)
5. Install the front and rear roll stopper mounting bolts (A, B) and then tighten the nuts.
Tightening torque :
50 - 65N.m (5.0 - 6.5kgf.m, 40 - 47lb-ft)
6. Install the muffler rubber hanger (A).
7. Connect the lower arm (A) with the knuckle and then install the bolt, nut (A) and split pin.
Tightening torque :
100 - 120N.m (10.0 - 12.0kgf.m, 72 - 87lb-ft)
8. Connect the tie-rod end with the knuckle and then install the castle nut (B) and split pin (A).
Tightening torque :
24 - 34N.m (2.4 - 3.4kgf.m, 17 - 25lb-ft)