isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Air Check Valve/Pipe Replacement - Bank 1|Page 2397 > < Air Check Valve/Pipe Replacement - Bank 1|Page 2395
Page 5
background image

2. Install the reactor pipe and gasket.

3. Install the reactor pipe assembly bolts.

Tighten:
Tighten the mounting bolts to 25 N.m (18 lb ft). Tighten the reactor pipe assembly retainer bolt to 40 N.m (30 lb ft).

4. Connect the reactor pipe assembly to the reactor pipes by installing the spring clamps.

5. For a 2WD vehicle, skip steps 8 and 9. For a 4WD vehicle, skip steps 6 and 7.

Air Check Valve/Pipe Replacement - Bank 1|Page 2397 > < Air Check Valve/Pipe Replacement - Bank 1|Page 2395