jaguar Workshop Repair Guides

Jaguar Workshop Service and Repair Manuals

Audio - Poor Reception Diagnosis & Modification|Page 5138 > < Audio - Poor Reception Diagnosis & Modification|Page 5136
Page 8
background image

During following operation ensure drill is at right angles to roof panel outer contour.

9.

Continue to drill 3 mm diameter pilot hole through panel inner strengthening panel.

10.

Select suitable 25 mm diameter hole saw.

11.

Dismantle hole saw and remove the twist drill.

12.

Cut and finish steel rod of suitable length and diameter for following operation.

13.

Assemble hole saw, using a rod of the same diameter as removed drill to protrude 10 mm from the saw face (Illustration 10). 

From inside vehicle

Caution:

During the next operation, ensure drill bit does not contact outer roof panel. A suitable drill stop in the form of a rubber sleeve will aid
previous operation.

14.

Using the drill removed from the hole saw, open up pilot hole in strengthening panel (Illustration 11).

Audio - Poor Reception Diagnosis & Modification|Page 5138 > < Audio - Poor Reception Diagnosis & Modification|Page 5136