jaguar Workshop Repair Guides

Jaguar Workshop Service and Repair Manuals

Variable Valve Timing Unit - Bank 2|Page 1938 > < Variable Valve Timing Unit - Bank 2|Page 1936
Page 2
background image

Installation 

1. Install new seals to the bush carrier.

Install the new sealing ring (scarf jointed) to the carrier bush groove. 
Install a new O-ring to the carrier oil-way.

2. Install the bush carrier to the cylinder block.

Lubricate the seal (scarf jointed) and the bush.
Install the bush carrier assembly.
Check that the seals are in place and that the ring dowels are engaged squarely. Fully locate the assembly as much as possible by hand pressure.
Install the three securing bolts. Tighten to 19-23 Nm.

3. Install the Timing Cover.
4. Move the engine compartment cover from the service position and connect the gas struts.
5. Remove the paint protection sheets and close the cover.
6. Connect the battery and install the battery cover.

Refer to the Battery Reconnection Procedure.

Variable Valve Timing Unit - Bank 2|Page 1938 > < Variable Valve Timing Unit - Bank 2|Page 1936