Grand Cherokee 2WD V8-5.7L VIN 2 (2005)
4. Install the center partition (3) into the right half of the air distribution housing (2).
5. Install the left half of the air distribution housing (1) onto the right half of the air distribution housing. Align the air door pivot shafts with each
other and with the pivot shaft holes in the housing.
6. Install the eight screws (5) that secure the two halves of the air distribution housing (3) together. Tighten the screws to 2.2 N.m (20 in. lbs).
7. Install the four metal clips (4) that secure the two halves of the air distribution housing together.
8. Inspect the foam seal (1), especially at the parting line (2). If the seal is deformed or damaged, it must be replaced.