Grand Cherokee 2WD V8-5.7L VIN 2 (2005)
5. Place the Staking Tool 9078 and Driver Handle C-4171 onto the output shaft.
6. Rotate the Staking Tool 9078 (2) until the alignment pin (3) engages the output shaft notch (4).
7. Press downward on the staking tool until the staking pin contacts the output shaft nut flange.
8. Strike the Driver handle C-4171 with a suitable hammer until the output shaft nut is securely staked to the output shaft.
9. For 2WD transmissions, install the propeller shaft.
Seal-Torque Converter Hub
REMOVAL
1. Remove the torque converter.
2. Remove the torque converter hub seal with suitable screw and slide hammer.
INSTALLATION
1. Position the torque converter hub seal (1) over the input shaft and against the transmission oil pump.
2. Using Seal Installer 8902A (2), install a new torque converter hub seal.
3. Install the torque converter.