Grand Cherokee 4WD V8-5.7L VIN 2 (2007)
13. Install the bolts (2) to hold the rear housing (1) to the front housing (3). Tighten the bolts at the dowel locations first, then the remainder of the
bolts in a criss-cross pattern. Tighten the bolts to 27 Nm (20 ft.lbs.).
NOTE: Pull up on the main shaft when installing the retaining ring to ensure that the ring is fully engaged into the groove.
14. Install the rear main shaft (1) retaining ring (2).
Lubricate the oil pump components with transmission fluid before installation.
15. Install the oil pump outer rotor (2) onto the main shaft (1) and into the rear housing (3).