jeep Workshop Repair Guides

Jeep Workshop Service and Repair Manuals

Relays and Modules - Power and Ground Distribution > < Module-Inverter|Page 6034
Page 3
background image

3. Position the TIPM (1) onto the mounting bracket (2) and push down until the four mounting clips are fully seated onto the mounting tabs (3).

4. Open the TIPM cover (4) and position the TIPM positive cable (2) onto the mounting stud (3) and install the retaining nut (1). Tighten the nut to

20 - 28 Nm (180 - 250 in. lbs.).

5. Fully seat the Airbag fuse holder (two fuses in one yellow carrier) and the Ignition Off Draw (IOD) fuse.
6. Close the TIPM cover (4).
7. Connect the battery negative cable.
8. Close the hood.
9. Insert the ignition key and turn it to the "RUN" position and wait twelve seconds. The TIPM will collect the necessary vehicle configuration and

VIN data from the CCN and PCM at this time. After twelve seconds turn the ignition key to the "OFF" position and then back to the "ON"
position and verify proper vehicle systems operation.

Relays and Modules - Power and Ground Distribution > < Module-Inverter|Page 6034